翻訳と辞書
Words near each other
・ Circumcision scar
・ Circumcision surgical procedure
・ Circumconic and inconic
・ Circumdatin H
・ Circumduction
・ Circumference
・ Circumferential Highway
・ Circumferential Highway (Nashua)
・ Circumferential Road 1
・ Circumferential Road 2
・ Circumferential Road 3
・ Circumferential Road 4
・ Circumferential Road 4 (disambiguation)
・ Circumferential Road 5
・ Circumferential Road 5–Kalayaan Avenue Interchange
Circumferential Road 5–Ortigas Avenue Interchange
・ Circumferential Road 6
・ Circumferentor
・ Circumfix
・ Circumflegrea railway
・ Circumflex
・ Circumflex artery
・ Circumflex branch of left coronary artery
・ Circumflex femoral artery
・ Circumflex fibular artery
・ Circumflex iliac artery
・ Circumflex scapular artery
・ Circumhorizontal arc
・ Circumlocution
・ Circumlunar trajectory


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Circumferential Road 5–Ortigas Avenue Interchange : ウィキペディア英語版
Circumferential Road 5–Ortigas Avenue Interchange

The Circumferential Road 5–Ortigas Avenue Interchange, also known as the C-5–Ortigas Interchange, is a pair of intersecting flyovers in Pasig, Metro Manila, the Philippines that serves as the junction between Circumferential Road 5 (C-5) and Ortigas Avenue. Originally a regular four-way intersection, the current interchange was inaugurated in 2003, and completed in 2004.
==History and technical specifications==
The C-5–Ortigas Interchange consists of two flyovers: a three-level, four-lane, long flyover along Circumferential Road 5, and a two-level, two-lane, left-turn flyover along Ortigas Avenue which would allow for the grade separation of traffic coming from eastern Metro Manila towards C-5 southbound. Another two-lane, flyover along Ortigas Avenue was also supposed to be constructed as part of the project, but was ultimately excluded from the project by the Department of Public Works and Highways.
Construction of the interchange began in January 2001, led by the Sumitomo Corporation, together with the Filipino Construction Magnate Company, F.F. Cruz and Company〔 and was finally completed in March 2004,〔 although the interchange was inaugurated on December 23, 2003 by Bayani Fernando, then serving as Chairman of the Metropolitan Manila Development Authority.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Circumferential Road 5–Ortigas Avenue Interchange」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.